Skip to content
eWiki The practical AI reference

AI Tool Glossary

Runway Credits Explained: Costs, Allowances, Expiration, and Top-Ups

A translucent blue glass pebble centered among rows of smooth white stones on a pale surface.

Runway credits are used for image, video, and audio generation. This guide explains documented plan allowances, the Gen-4.5 rate, expiration rules, spending order, and additional credit purchases.

What Runway credits cover

Runway says credits are used to generate images, videos, and audio. Credit costs are presented as rates, and a displayed rate may not equal the total cost of one generation.

The official example is Gen-4.5 video, which uses 12 credits per generated second. Runway calculates the total as 60 credits for five seconds or 120 credits for ten seconds. Its model catalog also lists numerous generation and processing tools, so a balance should not be treated as a fixed number of outputs across the catalog.

As a planning suggestion, identify the exact tool and intended output length before estimating a project. For Gen-4.5, multiply the requested seconds by 12.

Black and blue discs, small metal weights, and a caliper arranged on a technical drawing, with translucent panels behind them.

Included Runway credit allowances

The official credit policy lists the following allowances:

  • Free: a one-time deposit of 125 credits.
  • Standard: 625 credits each month.
  • Pro and Unlimited: 2,250 credits each month.
  • Max: 9,500 credits each month.
  • Team: 6,900 credits per seat each month, shared across the workspace.
  • Enterprise: Runway directs customers to its separate Enterprise Credits FAQ.

For scale, dividing 625 credits by the documented Gen-4.5 rate gives 52 complete generated seconds with one credit remaining. Dividing 2,250 credits by the same rate gives 187 complete seconds with six credits remaining. These are arithmetic illustrations based on a single documented rate, not forecasts of completed project footage.

As a suggestion, compare plans using the tools and features required as well as the included credits. Runway’s pricing page lists differences in capabilities such as storage, projects, parallel generations, and model access.

A person adjusts a large rectangular studio light mounted on a wheeled stand in an empty indoor space.

Expiration and rollover rules

Expiration depends on the plan and how the credits were obtained. Standard, Pro, and Unlimited monthly credits expire on the billing date. Max allows up to one month of unused credits to roll over, while Team allows up to one month of unused pooled credits to roll over.

Purchased credits do not expire. The Free plan’s one-time deposit also does not expire.

Runway defines the billing date as the day of the month on which the plan was first initiated. Monthly subscribers receive their subscription charge on that day, while annual subscribers retain the same monthly billing date based on when the plan began.

Which credits Runway spends first

When an account contains multiple credit types, Runway applies them in a set order: current-month plan credits first, rollover credits second, and additionally purchased credits last.

This order places non-expiring purchased credits after plan and rollover balances. As an account-management suggestion, record the balance before a large batch of generations and check it again afterward. For a shared Team workspace, consider setting an internal project budget, since Runway describes both the included Team allowance and purchased Team credits as shared workspace pools.

Checking a balance and buying additional credits

Runway says the credit balance is available on the Plans & Billing page. Users on Standard, Pro, Unlimited, Max, and Team can purchase additional credits there. The minimum purchase is 1,000 credits, and additional purchases are unavailable on Free.

For Team plans, only workspace administrators can purchase credits, and purchased credits enter the shared workspace pool. Runway also says Team administrators can enable auto-refill so generation continues after the monthly pool is exhausted.

As a suggestion for teams, have an administrator compare the shared balance with the estimated project requirement before starting a credit-intensive batch.

Conclusion

A practical estimate for Gen-4.5 is planned seconds multiplied by the documented rate of 12 credits per second. Three ten-second generations would therefore require 360 credits; five would require 600 credits. Both totals are below the 625-credit Standard monthly allowance, before any other credit use.

My practical recommendation is to check the current balance, confirm the exact tool’s displayed rate, and budget each planned generation before choosing a plan or purchasing at least 1,000 additional credits. For Team, include all members’ expected use because the allowance and purchases are shared across the workspace.

Sources

Disclosure

This article was prepared with AI assistance.

Improve this guide

Report a problem or suggest the next question

Submissions enter a private editorial queue. They are reviewed and deduplicated before any public update or new page is created.